By optimizing electricity usage, unnecessary power consumption can be reduced, creating an economical and safe power environment.
What is the 3S Green Construction Project?
The project involves visiting and inspecting factory power facilities to check whether costs are being paid for surplus electricity. By changing industrial high voltage to low voltage through facility construction, it is possible to reduce electricity bills (25-39%) and significantly lower maintenance costs according to KEPCO’s regulations.